InfraBuild Steel · Jul to Dec 2025
Clarifier Bridge Rescue and Entry Modifications
Davit anchor point and step through ladder, Newcastle Rod Mill
- Problem
- The clarifier basin is a confined space with no rated retrieval point on the bridge, so entry could not be made compliant.
- What I did
- Designed a 3M davit floor mount into the bridge steel, raised the weld quality requirement to 100% MPI or LPI examination, and replaced the rung ladder with a step through ladder to AS1657.
- Result
- Rescue retrieval compliance achieved for confined space entry, and the climb now finishes at a protected step through rather than a rung.