InfraBuild Steel · Jun 2025

Custom Roll Adjustment Spanner

FEA verified tool, design to release, Newcastle Rod Mill

Released with SAP BOM

Problem
Operators adjusted rolls with a tool that forced a poor posture and a high applied load, and no engineered replacement existed.
What I did
  • Designed a purpose built spanner, verified it by FEA and hand calculation, and took it through the full release including the SAP BOM.
Result
Manual handling risk removed at the source, with a verified, stocked and reorderable tool under change control.

Verification record, static stress studies, 5 Jun 2025

StudyElementsNodesConvergenceWorst Jacobian
Initial geometry8 19314 5760.904%1.11
Revised geometry8 38215 0340.409%2.36
Coarse mesh check, h refined once6641 5161.51%1.96
Interim configuration8 30214 7830.518%1.12
Released configuration8 40414 9070.567%1.08