InfraBuild Steel · Jun 2025
Custom Roll Adjustment Spanner
FEA verified tool, design to release, Newcastle Rod Mill
- Problem
- Operators adjusted rolls with a tool that forced a poor posture and a high applied load, and no engineered replacement existed.
- What I did
- Designed a purpose built spanner, verified it by FEA and hand calculation, and took it through the full release including the SAP BOM.
- Result
- Manual handling risk removed at the source, with a verified, stocked and reorderable tool under change control.